Shandong Lithium Source Technology Co., Ltd. 80,000 tonnes of iron phosphate precursor project environmental impact assessment of public participation in the second public announcement


Release time:

2024-10-21

Work system and labour force: annual operation 7200h, new labour force 160 people.

According to the ‘Environmental Impact Assessment Law of the People's Republic of China’ and ‘Measures for Public Participation in Environmental Impact Assessment’ (Decree No. 4 of the Ministry of Ecology and Environment), the draft of ‘Environmental Impact Report on 80,000-tonne Iron Phosphate Precursor Project of Shandong Lithium Source Science and Technology Co., Ltd.’ has been prepared, and the opinions related to the environmental impact of the project need to be solicited:

According to the requirements of ‘Measures for Public Participation in Environmental Impact Assessment’, the second environmental impact assessment information is hereby publicised to the public. The content of the public announcement is as follows:

I. Construction project overview

Project name: 80,000 tonnes of iron phosphate precursor project

Construction unit: Shandong Lithium Source Technology Co.

Construction Location: Shandong Lithium Source Technology Co.

Project Nature: New construction

Work system and labour force: annual operation 7200h, new labour force 160 people.

Construction content: the project relies on the existing tank area in the plant, technical transformation of the ferrous phosphate salt workshop, synthesis workshop, etc., the new acquisition of flash dryer, rotary kiln, water treatment system, storage tanks, centrifuges and other advanced equipment; the construction of a recycling of ferric phosphate dregs to produce 25,000 tonnes of ferric phosphate production line and a 55,000 tonnes of ferric phosphate production line, and at the same time, by-production of ammonium sulphate.

Second, the name and contact information of the construction unit

Unit Name: Shandong Lithium Source Technology Co.

Address:No.1999 Changcheng Street, Jancheng County, Heze City, Shandong Province, China

Contact person: Mr Geng Tel: 18615307707

Third, the name of the environmental impact report preparation unit

Unit name: Shandong Lujin Environmental Engineering Co.

Download Public Comment Form

If you have any opinions and views on the project, please fill in the public participation form for environmental impact assessment of construction projects according to the format of the link below, and fill in the suggestions and opinions related to the environmental impact and environmental protection measures of the project (Note: According to the ‘Measures for Public Participation in Environmental Impact Assessment’, opinions or claims related to land requisition and relocation, property, employment, etc., which are unrelated to the EIA of the project, do not belong to the public participation content of the project's EIA).  The EIA public participation comment form can be downloaded from the website of the Ministry of Ecology and Environment, see the link below: http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html.

V. Ways and means of obtaining the draft report for comments

The electronic version of the draft report can be obtained through the following link, or by contacting the construction unit.

Link: https://pan.baidu.com/s/1ba5T9TuhWW1noCnu6gk11g

Extraction code: ugdx.

Scope of public consultation

The scope of this public consultation is mainly residents, schools, hospitals and related enterprises and institutions within 5km of the project.

Ways and means of public comments

If you have any comments and views on the project, please feedback to the construction unit or the environmental impact assessment unit within ten working days from the date of public announcement. You can fill in the public comment form and send it by email or send a letter by post (postmark date shall prevail) to reflect the comments and suggestions related to the environmental impact of the construction project. When you submit your comments, please indicate the date of submission, your real name and valid contact information for feedback as needed.

VIII. Starting and ending time for public comments

Within ten working days from the date of this public notice.

Shandong Lithium Source Technology Co.

28th December 2023